info@sunlynksolar.com+91 8573003001
SunLynk Solar Logo
Solar Glossary

Solar Glossary That Makes Technical Terms Easy to Understand

Every term on a rooftop solar quote, explained in plain words, along with the question worth asking when it shows up. Search for a word, or browse by section.

52 terms in 7 sections•Updated November 2026
01

Types of System

On-grid, hybrid and the battery that makes backup possible.

On-Grid Solar

Your panels power the house and send any surplus to the UPPCL grid through a net meter. There is no battery.
The catch is the power cut. When the grid goes down, the inverter switches off for safety, so you get no solar power during a cut, even at noon. On-grid is the cheapest kind of system and the one the PM Surya Ghar subsidy is built around. PM Surya Ghar
At SunLynk
Most SunLynk Solar homes run on-grid systems.

Hybrid Solar

An on-grid system with a battery added. On a normal day it exports to the meter like any on-grid system. When the grid fails, it switches to the battery and keeps the loads you've chosen running.
It needs a different inverter (a hybrid inverter) and costs more, but it answers the question almost every Lucknow homeowner asks first: what happens during a power cut? Hybrid Inverter
At SunLynk
SunLynk installs hybrid systems with battery banks for customers who want backup. See Hybrid Solar.

BESS (Battery Energy Storage System)

Sometimes written “BECC” on quotes

The battery part of a hybrid system: the cells, the electronics that manage them, and the enclosure, sized in kWh. A 5 kWh BESS can run fans, lights, a fridge and a router for several hours.
Ask three things about any battery on a quote: the chemistry (lithium iron phosphate is the usual choice now), the usable capacity, and the cycle life, meaning how many charge and discharge cycles it is rated for.
02

The Numbers on Your Quote

kW, units and the figures that decide what you actually save.

kW (Kilowatt)

System size: how much power the system can produce in full sun. A 3 kW system is six 550 W panels.
It's the number printed on the quote and the one the subsidy is calculated on. It is not the number that decides your savings. That's the next term.

kWh, or Unit

What your electricity bill charges you for. One unit is one kilowatt running for one hour.
A 3 kW system in Lucknow makes roughly 11 to 13 units a day averaged over the year: more in May, fewer in December and through the monsoon. If an installer promises a figure, ask for it in units per year and get it in writing.

Efficiency

The share of sunlight hitting a panel that becomes electricity. Residential panels today sit between 20% and 23%.
Higher efficiency gets more watts out of the same roof area, which matters most when the roof is small.
At SunLynk
SunLynk's SLS-550+ modules are rated at 21.6%

Degradation

Every panel loses a little output each year. A good one drops about 2% in its first year and less than 0.5% a year after that, so at year 25 it still produces around 85% of its original rating. The performance warranty is the manufacturer's promise on that curve.
Panels damaged in transit or by careless clamping lose output much faster, which is why inspection and mounting matter as much as the brand on the label.

Peak Sun Hours

The hours in a day when sunlight is strong enough to count as full output. Lucknow averages about 4.5 to 5.
This is how a 3 kW system ends up at around 12 units a day: 3 kW multiplied by roughly 4.5 hours, minus losses.

Generation Guarantee

An installer's written promise of a minimum number of units per year, with a payment if the system falls short. Few installers offer one, because it means standing behind their own design and components.
At SunLynk
SunLynk's LynkSure plan guarantees annual output for five years and pays ₹8 for every unit of shortfall.*
03

Panels

Cell types, ratings and the defects worth knowing about.

Monocrystalline (Mono)

Panels made from single-crystal silicon. They're black, and more efficient than the older blue polycrystalline type.
Almost every residential panel sold in India is now mono. If a quote says “poly”, you are probably looking at old stock.

Mono PERC

Mono cells with a reflective layer at the back that catches light passing through the cell and sends it back for a second pass. It has been the standard home panel for the last few years and is still a sound choice.

TOPCon

A newer cell design that is more efficient than PERC and loses less output in heat. In a Lucknow summer, that second point counts. Most of the better 2026 panels use it.

Bifacial

A panel with glass on both sides, so it also collects light reflected off the roof surface behind it. On a light-coloured terrace that adds a few percent of output.
At SunLynk
The SLS-550+ is a bifacial module.

Wp (Watt-Peak)

The rated output of one panel under standard test conditions. 550 Wp means 550 watts in a lab at 25°C; on a 42°C roof it will be lower.
Use Wp to compare panels. Use units to judge the system.

Half-Cut Cells

Each cell is cut in two and the panel is wired as two halves. If one half is shaded or damaged, the other half keeps producing. Most 550 W panels use them.
At SunLynk
The SLS-550+ uses half-cut cells.

Micro Cracks

Hairline fractures in the cells, invisible from outside, caused by rough handling in transit or by clamps that press unevenly on the frame. The panel works on day one, then loses output over the first year.
Two things prevent them: inspecting every panel before it goes up, and mounting with clamps that spread the load (see H-profile clamps). H-profile clamps
At SunLynk
SunLynk runs an EL (electroluminescence) test on each panel, which shows cracks the way an X-ray shows a fracture, plus a 50+ point checklist before installation. Every system is fitted with H-profile clamps so the frame is never stressed at a single point.

Hot Spot

A cell that runs hotter than its neighbours because it is shaded, cracked or dirty and is being forced to carry current from the rest of the string. Over time it burns the backsheet.
Bypass diodes in the junction box limit the damage. Clean glass and a shade-free layout prevent it in the first place.

PID (Potential Induced Degradation)

Output loss caused by voltage leaking between the cells and the frame in hot, humid conditions. Lucknow's monsoon is exactly the climate where it shows up.
Good panels are tested as PID-resistant. Look for it on the datasheet.

Temperature Coefficient

How much output a panel loses for every degree above 25°C. Typical values are 0.30% to 0.40% per degree.
On a panel at 65°C in May, that works out to 12% to 16% below the rated figure, which is why a 3 kW system never shows 3 kW on the meter at a summer noon. TOPCon panels have a lower coefficient than PERC, one reason they do better here.

Tier 1 Manufacturer

A bankability list published by Bloomberg (BloombergNEF), not a quality mark. It means the maker has supplied large, financed projects.
That's a reasonable sign the company will still exist to honour a 25-year warranty. It tells you nothing about how your panels were handled after they left the factory.
At SunLynk
SunLynk's panels are made by Premier Energies.
04

Inverter & Electricals

The box on the wall and the wiring that connects everything.

Inverter

Turns the DC electricity from the panels into the AC your house runs on.
It is the component most likely to fail in the first ten years. In practice, its warranty (usually 5 to 10 years) and the installer's repair cover matter more than the panel warranty.

String Inverter

One inverter for the whole array, with the panels wired in series as a “string”. Simple, reliable and the right choice for most roofs.
Its weakness: one shaded or weak panel drags down the whole string, so panel matching and placement matter.
At SunLynk
SunLynk installs string inverters.

Hybrid Inverter

A string inverter that also manages a battery: charging it from solar, drawing on it during a cut, and deciding when to export. Any system with backup needs one.
It costs more than a plain on-grid inverter, so only buy one if you want backup. But if you think you'll want backup later, buy it at the start. Swapping inverters afterwards costs more.

Anti-Islanding

The safety rule that makes an on-grid inverter shut down when the grid fails, so it can't push power into lines a lineman may be repairing.
It's why on-grid gives you nothing during a cut, and why a hybrid system needs a changeover that isolates your house before the battery takes over.

DC and AC Cables, MC4 Connectors

The wiring runs from panels to inverter (DC) and from inverter to your distribution board (AC). MC4 is the standard plug on panel cables.
Loose or counterfeit MC4 connectors are the most common reason a system “stops” in its first year.
At SunLynk
MC4 connectors are one of the items on SunLynk's pre-installation inspection.

Earthing and Lightning Arrester

The panels and structure are bonded to earth, and a lightning arrester is fitted on the array. Both are required for net-metering approval.
Check that both are on the quote. Cheap quotes sometimes leave them to be “added later”.

Monitoring

An app or web portal that shows daily generation. Without it, you can't tell whether a smaller saving on your bill is the weather or a fault.
Check what the inverter offers, and whether the installer sets it up for you.
05

Structure & Mounting

The part of the system most quotes say least about.

Mounting Structure

The steel frame that holds the panels at an angle and fixes them to your roof.
Most quotes say the least about it, yet it decides whether your roof leaks and whether the panels stay put in a storm.
At SunLynk
SunLynk's structure is LynkShield: pre-fabricated IS:2062 steel with a written waterproofing warranty.

GI (Galvanised Iron)

Steel with a zinc coating to stop rust. The term alone tells you very little, because the coating can be anything from 20 microns to over 100.
Thin pre-galvanised sheet starts rusting at cut edges and bolt holes within a few monsoons.

HDGI (Hot-Dip Galvanised Iron)

Steel dipped in molten zinc after it has been cut and drilled, so the coating covers the edges and holes too, and is thick enough to last decades.
Ask for the coating thickness in microns. 80 and above is the figure to look for. micron
At SunLynk
SunLynk uses 80+ micron HDGI with 5-inch C-section leg columns, rated for a 25-year structure life.

Micron

One thousandth of a millimetre. Zinc coating is measured in microns.
80 microns is roughly the thickness of a sheet of paper. That sounds thin until you learn the industry's cheap default is 40.

Wind Load Rating

The wind speed the structure is designed to survive. Lucknow gets pre-monsoon storms: a structure rated for 120 km/h is ordinary, while 170 km/h is built with margin.
At SunLynk
LynkShield is rated to 170 km/h.

Chemical Anchoring

Fixing the structure's legs to the roof slab with bolts set in epoxy resin, instead of hammered-in expansion bolts.
The resin bonds to the concrete rather than wedging against it, so the slab doesn't crack around the bolt and water has no path in.
At SunLynk
SunLynk uses Hilti chemical anchors, and the structure comes with a written water-leak guarantee.

Slab Load Check

Confirming that your roof slab can carry the structure and panels, and that the anchoring points are sound, before anything is drilled. Installers who quote over a phone call skip it.
At SunLynk
The slab load check is part of SunLynk's site survey.

Panel Clamps (Mid and End Clamps)

The small aluminium pieces that hold each panel to the rails. Standard clamps press on a single point of the frame, and if over-tightened they bend it and crack the cells, which is how micro cracks start.
The alternative is the H-profile clamp. H-profile clamp

H-Profile Clamps

Clamps with an H-shaped cross-section that grip the panel frame along its length instead of at one point.
Standard clamps are cheaper, and an installer in a hurry can over-tighten them, bending the frame and cracking the cells behind it. H-profile clamps spread that force, so the panel sits flat and unstressed.
At SunLynk
SunLynk fits H-profile clamps on every system. They're the installation half of preventing micro cracks; inspection is the other half.

Tilt Angle

The angle the panels are set at. At Lucknow's latitude, about 25 to 27 degrees gives the best year-round output. A flatter angle gives up some winter output in exchange for easier cleaning.
At SunLynk
The LynkDesign survey decides the tilt for your roof.
06

Weather & Climate

What Lucknow's summers, monsoon and winter fog do to output.

Seasonal Variation

A Lucknow system doesn't make the same number of units every month. Output peaks from March to May, dips in July and August under monsoon cloud, and is lowest in December and January, when days are short and fog sits until late morning.
A yearly figure averages this out; your monthly bill won't. If an installer quotes “12 units a day”, ask whether that's a May day or the yearly average.

Soiling

Dust, bird droppings and pollution settling on the glass. With Lucknow's dust and winter smog, an uncleaned panel can lose 10% to 20% of its output within a few weeks of a dry spell.
Cleaning is the cheapest way to protect generation.
At SunLynk
That's why LynkCare includes regular cleaning instead of leaving it to you.

Shading

Anything that casts a shadow on a panel: a water tank, a parapet wall, a neighbour's new floor, a tree that was small when the panels went up.
Because panels in a string are wired in series, a small shadow on one panel can cut the whole string's output far more than its size suggests.
At SunLynk
The LynkDesign survey maps shade across the day before deciding where panels go.

Monsoon and Water

Panels are sealed and rated for heavy rain, so in the monsoon the risk is your roof, not the panels. Water gets in where the structure is anchored, if the anchoring has cracked the slab or the sealant has failed.
At SunLynk
Chemical anchoring and LynkShield's waterproofing warranty exist for exactly this.

Wind and Storms

Pre-monsoon storms in Uttar Pradesh bring gusts strong enough to lift a poorly anchored array. The structure's wind rating and the anchoring method decide whether that's a real risk for your roof.
At SunLynk
LynkShield is rated to 170 km/h.

Hail

Rare in Lucknow, but not unknown. Under IEC standards, panels are tested against 25 mm hailstones at 23 m/s, and a panel certified to IEC 61215 has passed that test. Ask for the certification on the datasheet.

Fog and Winter Haze

In December and January, mornings often don't clear until 10 or 11. Expect 40% to 50% less output than on a clear spring day during those weeks.
Any honest yearly figure already allows for it.
At SunLynk
So does the LynkSure guarantee calculation.

Cleaning Frequency

In Lucknow: every two to four weeks in the dry months and after any dust storm, and less often in the monsoon, when rain does part of the job.
Use water and a soft cloth or brush, early morning or evening while the glass is cool. Never a pressure jet or anything abrasive.
07

Grid, Meter & Money

Net metering, UPPCL, the subsidy and paying for it.

Net Metering

A two-way arrangement that counts the units you import from UPPCL and the units you export to it. You're billed for the difference, and if you export more than you import in a month, the credit carries forward.
It's what makes on-grid solar pay. It needs UPPCL approval, which your installer should handle.

Bidirectional Meter

The physical meter that does the counting for net metering. UPPCL fits it after your system passes inspection. Until then you can't export, and the system shouldn't be switched on.

UPPCL

Uttar Pradesh Power Corporation Limited, the state power utility responsible for Lucknow's electricity distribution. Your net-metering application, meter and monthly settlement all go through it.
An installer who has filed many of these knows the process. A new one learns it on your file.

PM Surya Ghar: Muft Bijli Yojana

The central government rooftop solar subsidy, paid into your bank account after installation and inspection. For 2026: ₹30,000 for a 1 kW system, ₹60,000 for 2 kW, and ₹78,000 for 3 kW and above.
Uttar Pradesh adds a state subsidy on top: ₹15,000 per kW, up to ₹30,000. For a 3 kW home that makes ₹1,08,000 in total.
At SunLynk
SunLynk quotes show the subsidy as a separate line, so you can see the net price.

Vendor Registration

To claim the subsidy, your installer must be registered on the PM Surya Ghar portal. Registration comes with obligations: a five-year warranty and five years of free repair and maintenance.
Ask to see the registration. An unregistered installer means no subsidy.

Payback Period

The years it takes for your bill savings to add up to what you paid. For a Lucknow home paying ₹3,000 to ₹4,000 a month, a subsidised 3 kW system typically pays back in 2 to 3 years, then keeps saving for roughly two more decades.*

EMI Financing

Paying for the system monthly instead of upfront. The test is simple: if the EMI is lower than your monthly bill saving, you're ahead from the first month.
At SunLynk
LynkFinance example: a 60-month loan at about ₹2,200 a month against a saving of about ₹2,900. Collateral-free, with 36- and 60-month tenures.

Read your quote against this page

Take the quote you already have and go through it line by line. If a term on it isn't explained here, ask the installer to explain it in writing.

Then check the other direction. If any of these are missing from the quote, ask why.

  • Structure coatingZinc thickness in microns, not just "GI"
  • ClampsStandard point clamps or H-profile
  • Inverter warrantyHow many years, and who files the claim
  • Repair coverWho pays for parts and labour, and for how long
  • Generation guaranteeMinimum units per year, in writing

Rather we went through it for you?

Book a free home visit. We check shade, roof strength and usable space, give you a 3D design, and put every promise in writing. No pressure: book only if you're satisfied.

  • Shade mapped on site
  • Slab and anchoring checked
  • 3D layout before ordering

* Actual generation, savings and payback depend on system size, rooftop conditions, electricity consumption and applicable DISCOM regulations. LynkSure generation guarantee terms and conditions apply. Subsidy amounts are as notified for 2026 and may change.

WhatsApp UsCall 8573003001Email Us : info@sunlynksolar.com
Connect Now